Search Legislation

Energy Act 2023

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Chapter 2

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the Energy Act 2023, Chapter 2. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Chapter 2E+W+SHydrogen grid conversion trials

153Modifications of the gas codeE+W+S

(1)For the purposes of this section, “hydrogen grid conversion trial” means a scheme designated by the Secretary of State that—

(a)relates to a particular place or area (the “trial location”),

(b)is designed to gather evidence for the purpose of enabling assessments to be made about the feasibility, costs and benefits of using hydrogen for heating or cooking,

(c)requires the network for supplying gas to the trial location to be modified so as to enable the supply of hydrogen, and

(d)is intended to have effect for a definite period.

(2)Schedule 2B to the Gas Act 1986 (the gas code) applies in relation to a hydrogen grid conversion trial—

(a)as if references to a gas transporter included a person (other than a gas transporter) who is conducting the trial, and

(b)as if it were modified in accordance with subsections (3) to (5).

(3)Paragraph 16 (alterations etc of burners on change of calorific value) applies as if—

(a)in sub-paragraph (1), the words “at a rate not exceeding 75,000 therms a year” were omitted, and

(b)in sub-paragraph (2), the steps required to be taken in respect of premises in the trial location also included any works required in respect of the premises (other than works already mentioned in sub-paragraph (2)) for the purposes or in consequence of the trial.

(4)Paragraph 23 (entry of premises during supply) applies as if the power conferred by sub-paragraph (1)(a) included power to enter premises in the trial location for the purpose of inspecting anything on the premises, or carrying out any tests on the premises, in preparation for or otherwise in connection with the trial.

(5)Paragraph 24 (entry of premises to discontinue supply) applies as if the power conferred by sub-paragraph (2) were exercisable for the purposes of the trial—

(a)in relation to any premises in the trial location, and

(b)notwithstanding sub-paragraph (1).

(6)For the purposes of the application of the Rights of Entry (Gas and Electricity Boards) Act 1954 in relation to a relevant power of entry (see paragraph 28(5) of Schedule 2B to the Gas Act 1986), the reference in section 1(2) of the 1954 Act to a gas operator includes a reference to a person (other than a gas transporter) who is conducting a hydrogen grid conversion trial.

(7)In subsection (6), “relevant power of entry” means a power of entry conferred by Schedule 2B to the Gas Act 1986, as it applies by virtue of this section in relation to a hydrogen grid conversion trial.

Commencement Information

I1S. 153 in force at 26.12.2023, see s. 334(3)(d)

154Regulations for protection of consumersE+W+S

(1)The Secretary of State may by regulations make provision—

(a)requiring a gas transporter to take specified steps to secure that consumers in a trial location are properly informed about a hydrogen grid conversion trial being conducted in the trial location;

(b)requiring a gas transporter to take specified steps to secure that consumers are given adequate warning of the need for their premises to be disconnected for the purposes of a hydrogen grid conversion trial;

(c)about the enforcement of requirements imposed by virtue of paragraph (a) or (b).

(2)Regulations under subsection (1) may confer functions on gas transporters in connection with the discharge of requirements imposed by the regulations.

(3)The provision that may be made by virtue of subsection (1)(c) includes provision for the imposition of civil penalties in respect of a failure to comply with a requirement imposed by the regulations (but does not include provision for the creation of a criminal offence).

(4)The Secretary of State may by regulations make provision designed to secure protection for consumers and other people who are affected, or likely to be affected, by a hydrogen grid conversion trial.

(5)The provision that may be made by regulations under subsection (4) includes, for example, provision—

(a)about the making of complaints about the exercise by a gas transporter of a power conferred by a relevant statutory provision;

(b)about the award of redress in specified circumstances;

(c)imposing requirements on gas transporters or other persons to provide information to consumers and others;

(d)for securing that consumers and others are not required to incur expenditure, or are not otherwise financially disadvantaged, as a result of a hydrogen grid conversion trial;

(e)for securing fair treatment of consumers and others before, during and after a hydrogen grid conversion trial;

(f)about the quality of products provided to consumers and others and the quality of works carried out on premises owned by consumers and others;

(g)about the enforcement of requirements imposed by the regulations on gas transporters or other persons.

(6)The provision that may be made by virtue of subsection (5)(g) includes provision for the imposition of civil penalties in respect of a failure to comply with a requirement imposed by the regulations (but does not include provision for the creation of a criminal offence).

(7)Where regulations under this section make provision for a civil penalty, they must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.

(8)Regulations under this section are subject to the negative procedure.

(9)In this section—

  • consumer” and “disconnected” have the same meaning as in Schedule 2B to the Gas Act 1986 (see paragraph 1(1) of that Schedule);

  • gas transporter” means—

    (a)

    a gas transporter within the meaning of Part 1 of the Gas Act 1986 (see section 7 of that Act), or

    (b)

    any other person who—

    (i)

    is conducting a hydrogen grid conversion trial, and

    (ii)

    does not require a licence under section 7 of the Gas Act 1986 as a result of an exemption under section 6A of that Act;

  • hydrogen grid conversion trial” and “trial location” have the same meaning as in section 153;

  • specified” means specified by regulations.

Commencement Information

I2S. 154 in force at Royal Assent, see s. 334(2)(d)

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources