Profile cover photo
You're now following
Error following user.
This user does not allow users to follow them.
You are already following this user.
Your membership plan only allows 0 follows. Upgrade here.
Successfully unfollowed
Error unfollowing user.
You have successfully recommended
Error recommending user.
Something went wrong. Please refresh the page and try again.
Email successfully verified.
User Avatar

Shukoor N.

@ShukoorN

verified-v2.svg
4.9
27
4.8
4.8
97%

Electrical Designer | Electrical & ELV Estimator

$12 USD / Hour
Flag of
Sri Lanka (4:55 AM)
Joined on March 21, 2020
$12 USD / Hour
Do you want to save your precious time on Electrical, Telecom, Security, Access Control, and Fire Alarm Quantity takeoff and cost estimation for Tender bids? Are you wondering how to expedite your tender bidding scope for Electrical & Low Voltage systems? Interested to increase the tender bid winning chances? I'm here to help you out & fulfill your complete Electrical & Low Voltage estimation needs with 8+ years of career experience and 100+ successful projects for US, Australian, UK, UAE & Saudi Arabia based clients. ✅ Offered Services: ● Tender Bidding Services - Electrical, Telecom, Security, Access Control, and Fire Alarm systems ● Generate Electrical Quantity Take-off(QTO) & Bill of Material (BOM) ● Create Electrical Bill of Quantity (BOQ) ● Estimate Labor against work done for Electrical & Low Voltage systems ● Tender bid evaluation & Cost review ● Tender bid site management - Bluebook, Planhub, Buildtrend ✅ Why Select me? ● 100+ successive project completions and 1000+ hours of effective service ● High quality services for a reasonable cost ● Strong technical background on Electrical and Low Voltage systems design and installation ● Work performed reference to local codes (NEC 2020, BS 7671, and AS/NZ 3000) ● Fluent in Autocad, PlanSwift & Bluebeam software You may drop me a private message through Upwork chat to get connected. I'll be back to you at the earliest with quality results that satisfies your needs. Client satisfaction shall be my priority.
Verifications
On time
92%
On budget
90%
Accept rate
100%
Repeat hire rate
6%

Portfolio

Portfolio

10020404
10020394
10020328
10020404
10020394
10020328
Changes saved
4.9 · 27 Reviews
Reviews
User Avatar
Harder worker and quality work!
Dj L.
@GetAlpha
Flag of
Nanaimo, Canada
2 years ago
Share
User Avatar
Thanks for the opinion!
Andrew K.
@Webextra
Flag of
Gravesend, United Kingdom
2 years ago
Share
M
Project for Shukoor N. $325.57 USD
Shukoor did an great job with my project. His research was very thorough and his writing was excellent.
Marcelo G.
@marcex
Flag of
Kirkland, United States
2 years ago
Share
R
Shukoor was dedicated and professional through out the project. Submission was on time with clear documentation. A good communicator and recommend for quality workmanship. Would hire Shukoor for future requirement.
Ranajit D.
@RanajitDas123
Flag of
Brisbane, Australia
2 years ago
Share
A
He is good when he needs work, could be more resposive
Al M.
@alokmazumdar
Flag of
Raleigh, United States
3 years ago
Share
Experience
MEP Engineer
Nov, 2018 - Present
5 years, 9 months
Building Services Engineering Consultants (Pvt) Ltd
Nov, 2018 - Present
5 years, 9 months
I have total of 5 years work experience in the Construction Industry. I'm expert in Mathematical Analysis & Technical Reporting using MS office packages. I'm good in English language and can handle tight deadlines on time. My expertise on designing and maintenance electrical installations helps me to become a quality technical writer.
Nov, 2018 - Present
5 years, 9 months
Education
University of the West of England
2013 - 2017
4 years
MEng. Electrical & Electronic Engineering (Hons)
Flag of
United Kingdom
2013 - 2017
4 years
Publications
Applicability of Nuclear Power to satisfy Sri lankan Power Demand
Open University - Engineering Journal
The base load demand of Sri Lanka is generally 1/3 rd of the peak demand, which should be generated throughout the day for the consumer’s usage. The rest load demand is mainly required for the usage in the peak hours usually 6.00pm to 10.00pm. The power plant type should be selected for each load demand separately according to its performance. Power plants which can produce electricity throughout the day can be used to satisfy the base load requirement.
Certifications
P
Preferred Freelancer Program SLA
US English - Level 2
US English
US English - Level 1
US English
Data Entry
Data Entry
Invite sent successfully!
Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.