Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems
$30-250 USD
クローズ
投稿日: 3年以上前
$30-250 USD
完了時にお支払い
Simulation Aided Scheduling Tool for Reconfigurable
Assembly Systems
The process:
1. Build the simulation in 2D.
2. Build the flow process for each product.
3. Insert average processing time (refer table) for each step.
4. Insert the number of products that arrive for each product (refer table, already
highlighted).
5. Insert the working hour shift
a. Shift 1: 0830 – 1230
b. Shift 2: 1330 – 1730
c. Monday -Friday only
6. The simulation needs to identify the number of days that every product will complete
based on the average processing time, working hour shift, the number of products that
arrive.
To build the model you can use anything you what related to Tecnomatix Plant
Simulation 15 such as MU, Method and etc
For the result, I need:
• Number of days for each product to finish
• Display in Gantt Chart.
Dear Sir
i am so interested in your project i can do it as i am mechanical engineer experienced in design for fabrication professional in cad and solidworks i worked in sheet metal electric panel enclosure i know well how to set dxf for laser cutting i am professional to draw 3d and 2d i do a lot of projects like yours