### **Project Title**
Development of a High-Speed US Coin Identification and Detection System (Hardware + Software Integration)
---
### **Project Description**
I am seeking an experienced software developer to collaborate on building a **high-speed US coin identification and detection system**. This system will integrate both hardware and software components to analyze coins for **key dates** and **mint errors**. I will handle the hardware development but will work closely with the software developer to ensure seamless integration throughout the project.
---
### **Project Objectives**
1. **Coin Identification**: Develop software that can analyze coins (front and back) using high-tech cameras at high speed.
2. **Key Date and Mint Error Detection**: The software must reference a **preloaded database of known key dates and mint errors** for all US coin types (pennies, nickels, dimes, quarters, half-dollars, and dollar coins).
3. **Precise Sorting**: If a match is found, the system will trigger a hardware mechanism to push the identified coin into a separate holding bin.
4. **Automated Reporting**: Generate an immediate printout for identified coins, including:
- Coin type
- Detected key date or mint error
- Approximate value (referenced from the preloaded library)
5. **Performance**: Ensure the system can process **thousands of coins per hour** while maintaining high precision, identifying even the smallest errors.
---
### **System Requirements**
#### **Hardware Integration**
1. **Camera Integration**:
- Use high-tech cameras (purchased separately) to analyze both the **front and back sides of coins simultaneously**.
2. **Conveyor Belt Control**:
- Work with a conveyor belt system where coins pass under the cameras.
- The software will trigger a **mechanical actuator** to push identified coins into a holding bin.
3. **High-Performance GPU Utilization**:
- Software must utilize **multiple RTX 3090 GPUs** for real-time image analysis and processing.
#### **Software Features**
1. **Coin Database**:
- Preload a comprehensive database of US coins, including:
- Known **key dates**.
- Detailed descriptions of **mint errors**.
- Approximate market values (sourced from online data).
2. **Real-Time Coin Analysis**:
- Analyze coins at high speed using images captured by the cameras.
- Match coins to database entries for key dates or errors.
3. **Detection Precision**:
- Must detect the **slightest imperfections or errors**, including small die cracks, doubling, off-center strikes, etc.
4. **Sorting System Control**:
- Trigger hardware to push identified coins into a bin while others continue to the end of the conveyor.
5. **Reporting**:
- Generate a **detailed printout** for each identified coin, including:
- Coin type
- Key date or mint error description
- Approximate value
---
### **Project Requirements**
- **Experience with Machine Vision and Image Processing**:
- Familiarity with OpenCV, TensorFlow, or similar technologies.
- **High-Speed Processing**:
- Must optimize software for processing large volumes of coins quickly and accurately.
- **Integration Expertise**:
- Ability to collaborate on hardware-software integration.
- **Database Handling**:
- Experience creating or managing searchable databases for the coin library.
- **Strong Communication**:
- Willing to work collaboratively to ensure hardware and software work seamlessly together.
---
### **Deliverables**
1. Fully functional software with the following features:
- Real-time coin analysis.
- Key date and mint error detection.
- Conveyor belt sorting control.
- Automated reporting and printout generation.
2. Documentation and user manual for the software.
3. Support during hardware-software integration and initial testing.
---
### **Additional Notes**
- **Budget**: Please provide an estimate based on the described requirements.
- **Timeline**: We aim to complete the project within [insert preferred timeline, e.g., 3-6 months].
- **Collaboration**: Regular updates and discussions are essential to ensure smooth hardware-software integration.
- **Future Expansion**: Potential for follow-up projects to add new features or refine the system.