✨✨✨ Hi, there! ✨✨✨
I read your project description carefully and it instantly grabbed my attention to align perfectly with my experience. Please review my experience.
⭐ My similar expertise ⭐
I developed a Java-based CPM & PERT visualization tool for project management, integrating multiple functionalities and input methods. The tool supports manual data entry, as well as importing from CSV and Excel files, and it includes features for loading Work-Breakdown Structure (WBS) tables. I implemented functionalities to display critical paths, activity durations, dependencies, and generate CPM & PERT networks with graphical visualization. The tool also includes a PERT chart in Java Swing and supports project-level summaries, task details, and resource allocation, with capabilities for project crashing based on economic dimensions.
Deliverables included comprehensive documentation, such as a README file with project overview, installation, and usage instructions, along with a detailed user guide and code comments. I also provided sample data, configuration files, and test scripts to ensure functionality and reliability.
So I'm confident I can deliver the high-quality product for you within your timeline.
If you have interest in my proposal, let's contact via chat!
Thank you.