Transportation Alternatives
Transportation Alternatives (TA) projects and activities encompass smaller-scale transportation projects such as pedestrians and bicycle facilities, historic preservation, safe routes to school and other transportation-related activities.
Since 1991, the Federal Transportation Acts have provided funding for transportation alternatives/enhancement activities, through a set-aside from the Surface Transportation Block Grant STBG) program.
Infrastructure Investment and Jobs Act/Bipartisan Infrastructure Law (IIJA/BIL) TA - (federal funding)
- Final FFY 2024 TA allocations (PDF 130KB)
- Final FFY 2023 TA allocations (PDF 131KB)
- Final FFY 2022 TA allocations (PDF 127KB)
Fixing America's Surface Transportation (FAST) act Transportation Alternative - STBG set-aside allocations (federal funding)
- Final FFY 2021 (PDF 128KB)
- Final FFY 2020 (PDF 90KB)
Redistributed OA Summary (PDF 154KB) - Final FFY 2019 (PDF 83KB)
- Final FFY 2018 (PDF 84KB)
Distribution formula
In 2022, the federal transportation act allocations for the Transportation Alternatives (TA) were modified as follows:
- Over 200,000 population – Distributed based on 2020 Census data as required.
- Urbanized areas greater than 50,000 but no more than 200,000 – Distributed based on 2010 Census data as required.
- Urban areas greater than 5,000 but no more than 49,999 – Distributed based on 2010 Census data as required.
- Under 5,000 population – Distributed based on 2010 Census data for this population area.
- Flexible:
Prior to distribution, $2.4 million (even year) and $1.7 million (odd year) is provided to the statewide Safe Routes to School (SRTS) program.
Distributed based on 2010 Census data for the total population of the area.
Reporting
IIJA/BIL FAST Act requires WSDOT to report to the Federal Highway Administration (FHWA) on the status of Transportation Alternatives (TA) projects. FHWA then compiles all the states reports and submits the national report annually to the United States Department of Transportation (USDOT) Secretary, as well as making it available to the public. The reports are to be based on each federal fiscal year (FFY) and are due to FHWA in early December.
Annually, each Metropolitan Planning Organization (MPO), Regional Transportation Planning Organization (RTPO) and County that receives a TA allocation is to submit to WSDOT a report for that FFY’s TA allocation that includes (TBD). Items likely to be required are:
- Number of project applications received that FFY;
- Cost of the projects for which applications were received that FFY;
- Number of projects selected for funding that fiscal year, including:
Costs of the projects selected, and
Location of the projects selected. - Types of projects to be carried out, based on the following seven categories:
Pedestrian & Bicycle Facilities
Recreational (recreational trail projects only)
Turnouts, Overlooks, Viewing Area
Historic Preservation
Environmental and Wildlife
Safe Routes to School
Other – Inventory, control or removal of outdoor advertising
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.