August bid tabulations
A record of the engineer's estimate and bid amount for each project, by bid item and contractor for the month of August.
2024
- Contract XE3558 - US 97 et al, Illumination and Signal Cabinet Update (PDF 67KB)
- Contract XE3560 - I-90, ER TMC Relocation - Communications Hub (PDF 64KB)
- Contract 23A825 - SR 515, Panther Creek Fish Passage - Demo 1 (Small Works Roster) (PDF 129KB)
2023
- Contract XE3469 - Executed 9/28/2023 I-90, 2.77 Miles West of Tinkham Rd WB Slope Stabilization (PDF 81KB)
- Contract XE3462 - Executed 10/5/2023 I-5, Dike Access Road Bridge - Bridge Deck and Expansion Joints (PDF 82KB)
- Contract XE3446 - Executed 9/28/2023 SR 305, West Port Madison, Agatewood Rd, Adas Will Ln Safety Improvements (PDF 202KB)
- Contract XE3466 - Executed 9/21/2023 2023 OR Region Wide Safety Features - Signing (PDF 61KB)
- Contract XE3461 - Executed 9/28/2023US 2 et al, NWR Breakaway Cable Terminal Replacement 21-23 (PDF 78KB)
- Contract XE3463 - Executed 9/12/2023 SR 14 et al, West Skamania and Klickitat Counties Stormwater Retrofits (PDF 60KB)
- Contract XE3465 - Executed 9/12/2023 US 12 Clear Fork Br/US 97 Br Over Bickleton Rd - Bridge and Deck Rehabs (PDF79KB)
- Contract XE3459 - Executed 9/21/2023 SR 4, 0.2 and 4.53 Miles W of Germany Creek Bridge - Slope Stabilization (PDF 73KB)
- Contract XE3458 - Executed 9/21/2023 SR 17, Soap Lake to Lake Lenore Caves - Unstable Slopes Re-Advertisement (PDF 75KB)
- Contract 23A814 - SR 20, Olson Creek Fish Passage - Demo 1 (Small Works Roster) (PDF 52KB)
2022
- Contract 9864 - Executed 10/24/2022 Strategic Concrete Bridge Deck Preservation (PDF 92KB)
- Contract 9863 - Executed 10/24/2022 Hood Canal Bridge Replace Pontoon Hatches - Phase 2 (PDF 59KB)
- Contract 9859 - Executed 9/9/2022 Airport Rd to E Casino Rd Seismic Retrofit (PDF 82KB)
2021
Contract 9717 - Cancelled West Of White Pass Repair Cable Net Post
2020
- CONTRACT 9581 - Executed 09/09/2020 BAINBRIDGE FERRY TERMINAL PARKING LOT REHABILITATION
- CONTRACT 9585 - Executed 08/28/2020 SR 506 TO RUSH ROAD INTERCHANGE ILLUMINATION REBUILD
- CONTRACT 9588 - Executed 08/10/2020 STAMPEDE PASS I/C EB REPLACE CONCRETE PANELS
- CONTRACT 9582 - Executed 9/29/2020 0.4 MILES W OF BJORNSGARD - SLOPE STABILIZATION PHASE 2
- CONTRACT 9584 - Executed 09/24/2020 LINCOLN CO TO BNSF RR BRIDGE - ROADSIDE IMPROVEMENTS
2019
- CONTRACT 9242 - Executed 10/30/2019 RENTON TO BELLEVUE WIDENING AND EXPRESS TOLL LANES
- CONTRACT 9474 - Executed 9/23/2019 NORTH OF PILGRIM RD E SLOPE STABILIZATION (SMALL WORKS ROSTER)
- CONTRACT 9470 - EDMONDS FERRY TERMINAL TIMBER PILE AND PAVEMENT REPAIRS (SMALL WORKS ROSTER)
- CONTRACT 9473 - Executed 9/23/2019 BOW HILL SB WEIGH STATION PRESERVATION
- CONTRACT 9471 - Executed 9/12/2019 ANACORTES FERRY TERMINAL SHARED PEDESTRIAN IMPROVEMENT
- CONTRACT 9469 - Executed 9/30/2019 SB INTERSTATE BR TO NE 78TH ST VIC ACTIVE TRAFFIC MANAGEMENT
- CONTRACT 9462 - Executed 9/5/2019 NSC BNSF-2ND RAILROAD ALIGNMENT
2018
- CONTRACT 9299 - Executed 8/27/2018 SE 599, SB S 133RD ST & S 124TH ST VIC VMS REPLACEMENT
- CONTRACT 9305 - Executed 8/29/2018 N OF CARBON RIVER BRIDGE ROCK SCALING (Small Works)
- CONTRACT 9301 - Executed 9/20/2018 TRAVELERS REST SAFETY REST AREA - ROOF REPAIR - SCR (Small Works Roster)
- CONTRACT 9302 - Executed 9/13/18 SR 7, PEDESTRIAN CROSSING SAFETY IMPROVEMENTS
- Executed 9/27/2018 JBLM DEMO 2018 (Small Works Roster)
- CONTRACT 9297 - Executed 9/27/2018 I-5, SR 510 INTERCHANGE - RECONSTRUCT INTERCHANGE
- CONTRACT 9309 - Executed 9/13/2018 I-90, 1.0 MILE W OF SNOQUALMIE SUMMIT EB - ROCKFALL MESH REPAIR (Small Works Roster)
- CONTRACT 9311 - Executed 9/11/2018 I-90, GARDEN SPRINGS TO BROAWAY AVE - RAMP METER (Small Works Roster)
- CONTRACT 9300 - Executed 9/20/2018 FACILITIES BRANCH, HYAK WASHBAY SUMP IMPROVEMENTS - SCR (Small Works Roster)
- CONTRACT 9308 - Executed 9/24/2018 SR 20, RAILROAD CROSSING IMPROVEMENTS (Small Works Roster)
- CONTRACT 9310 - Executed 9/24/2018 US 2 EASY STREET EAST PEDESTRIAN TRAIL (Small Works Roster)
- CONTRACT 9312 - Executed 9/24/2018 42ND AND 54TH INTERSECTIONS SAFETY IMPROVEMENTS
2017
- CONTRACT 9136 - Executed 9/18/2017 NOOKSACK RIVER BRIDGE SPECIAL REPAIR - (Small Works Roster)
- CONTRACT 9135 - Executed 9/12/2017 SR 504, WOOSTER CREEK CULVERT REPLACEMENT - CHRONIC ENVIRON. DEFICIENCY
- CONTRACT 9129 - Executed 9/5/2017 SR 163, POINT DEFIANCE FERRY TERMINAL EMERGENCY GENERATOR - (Small Works Roster)
- SR 527, Executed 9/6/2017 15TH AVE SE TO SEATTLE HILL RD BIKE AND PEDESTRIAN IMPROVEMENTS - (Small Works Roster)
- CONTRACT 9131 – All Bids Rejected SR 519, SEATTLE FERRY TERMINAL SLIP 1 OVERHEAD LOADING CYLINDER RENEWAL
- CONTRACT 9134 – All Bids Rejected I-5, MARTIN WAY TO MARVIN ROAD STORMWATER RETROFIT (Small Works Roster)
- Executed 9/7/2017 NSC - HAZARDOUS MATERIAL SITE ABATEMENT - OXARC
- NSC 2017 DEMO NO 2
- CONTRACT 9142 - Executed 9/27/2017 BURLINGTON PEO TENANT IMPROVEMENTS
- CONTRACT 9141 - All Bids Rejected US 2 ET ALL, STRATEGIC PAVEMENT PRESERVATION 2017
2016
- CONTRACT 8951 - Executed 8/29/2016 US 2, W OF ALICE RD BR DECK REHAB (Small Works Roster)
- CONTRACT 8956 - Executed 8/29/2016 I-90, GOLF COURSE RD IMPROVE PARK & RIDE LOT (Small Works Roster)
- CONTRACT 8818 - Executed 8/29/2016 SR 16 INTERCHANGE - CONSTRUCT HOV CONNECTIONS - Design-Build
- CONTRACT 8950 – Executed 9/6/2016 SR 524, WB 21ST AVE W TO 196TH PL SW PEDESTRIAN IMPROVEMENTS
- CONTRACT 8954 – Executed 9/6/2016 SR 155, COULEE CITY NORTH CENTERLINE RUMBLESTRIPS
- CONTRACT 8958 – Executed 9/6/2016 SR 302, 1.15 MILES S OF E VICTOR RD MAJOR DRAINAGE
- CONTRACT 8940 – Executed 9/29/2016 SR 20 SPUR, ORCAS FERRY TERMINAL FACILITY ADA COMPLIANCE IMPROVEMENTS
- CONTRACT 8955 - Executed 9/7/2016 FACILITIES, VANCOUVER MAIN STREET OFFICE BUILDING 02 - ROOF REPLACEMENT
- CONTRACT 8959 - Executed 9/29/2016 I-405, NE 30TH ST & NE 44TH ST RAMP IMPROVEMENTS
- CONTRACT 8957 - Executed 10/4/2016 SR 104, NE 195TH ST GABION ROCK WALL EMERGENCY REPAIR
2015
- CONTRACT 8798 - Executed 8/28/15 I-90, WINCHESTER EB SRA MINOR REHABILITATION
- CONTRACT 8800 - Executed 9/21/15 SR 410, WHITE RIVER BRIDGE 410/101 BRIDGE ELEMENT REPAIR
2014
- CONTRACT 8654 - Executed 9/2/14 US 2/ SR 207, NCR 13-15 LOW COST PAVEMENT REPAIR & CRACK SEALING
- NSC 2014 DEMO NO 2
- CONTRACT 8651 - All Bids Rejected BRANCH RD/RR XING - UPGRADE WARNING SYSTEMS
- CONTRACT 8656 - Executed 9/15/14 TUMWATER MATS LAB HVAC AND ACCESS CONTROLS - UPGRADES
- CONTRACT 8657 - Executed 9/26/14 I-90, LAKE WASHINGTON FLOATING BRIDGES ANCHOR CABLE REPLACEMENT
- CONTRACT 8658 - Executed 9/10/14 I-5, KLICKITAT DR - UNSTABLE SLOPE
- CONTRACT 8660 - Executed 9/23/14 I-5 & I-205, BI-STATE CORRIDOR TRAVEL TIME - ADD SIGNING
2013
- CONTRACT 8512 - Executed 8/30/13 SR 272, COLFAX AREA DRAINAGE IMPROVEMENTS
- CONTRACT 8519 - Executed 9/8/13 US 101, FAIRMOUNT RD VICINITY SAFETY IMPROVEMENTS
- CONTRACT 8515 - Executed 9/8/13 US101/SR 105, SR 105 HEATHER RD AND US 101 0.5 MI N OF RAYMOND CULVERT REHAB
- CONTRACT 8518 - Executed 8/23/13 I-5, SKAGIT RIVER BRIDGE, BRIDGE ELEMENTS REPAIR
- CONTRACT 8517 - Executed 9/11/13 US 2/97, EASY ST. LINK STOP WB
- CONTRACT 8521 - Executed 9/17/13 OLYMPIC REGION MAJOR ELECTRICAL REHABILITATION REBUILD SIGNALS - STAGE 1
- CONTRACT 8520 - Executed 9/19/13 1.0 MILE W OF SNOQUALMIE SUMMIT EB - ROCKFALL MESH REPAIR
- CONTRACT 8516 - Executed 9/17/13 REYNOLDS AVE SIGNAL REPLACEMENT PROJECT
- CONTRACT 8496 - Executed 10/3/13 NSC - BNSF RAILWAY STRUCTURES/REALIGNMENT
- CONTRACT 8524 - Executed 10/8/13 SR 163, POINT DEFIANCE FERRY TERMINAL TRESTLE REPAIRS
2012
- CONTRACT 8355 - Executed 9/6/12 SPRAGUE LAKE SRA WB - WELL REPLACEMENT
- CONTRACT 8353 - NCR ADA RURAL UPGRADES
- CONTRACT 8352 - Executed 9/4/12 I-5, SPOKANE STREET INTERCHANGE VIC - SPECIAL BRIDGE REPAIR
- CONTRACT 8354 - Executed 9/6/12 US 12, RAILROAD BRIDGE SEISMIC RETROFIT
- CONTRACT 8359 - Executed 9/5/12 OLYMPIC REGION HQ BUILDING 6 ROOF RENOVATION
- CONTRACT 8358 - Executed 9/4/12 VIC. OHOP VALLEY EXTENSION RD TO S. OF 304TH ST E - SAFETY
- CONTRACT 8360 - Executed 9/20/12 BULLFROG WATER TANK REHABILITATION
- CONTRACT 8367 - Executed 9/24/12 INTERCITY BUS PROGRAM - BUS SHELTERS AND BUS STOP INSTALLATIONS
- CONTRACT 8362 - Executed 9/11/12 STATEWIDE DURABLE STRIPING RE-ADVERTISEMENT WITH WORK REMOVED
- CONTRACT 8361 - Executed 9/11/12 WEST OF TWISP WIRE MESH REPAIR
- CONTRACT 8365 - Executed 10/3/12 ELLENSBURG MAINTENANCE SHOP BUILDING ROOF REPLACEMENT
- CONTRACT 8364 - Executed 10/3/12 ROOF REPLACEMENTS WANDERMERE AREA MAINTENANCE FACILITY AND PINES FACILITY
- CONTRACT 8345 - Executed 9/25/12 SR 105, SMITH CREEK AND NORTH RIVER REPLACE BRIDGES
- CONTRACT 8366 - Executed 10/3/12 SR 104, HOOD CANAL BRIDGE SHOULDER RETROFIT
- CONTRACT 8369 - Executed 9/28/12 I-5, BARNES ROAD AND US 12 INTERCHANGES ILLUMINATION UPGRADE
- ALDER CANYON SLIDE EMERGENCY SLOPE STABILIZATION
2011
- CONTRACT 8199 - Executed 9/7/11 SR 161, 24TH ST EAST TO MILTON WAY WIDENING
- CONTRACT 8198 - Executed 9/21/11 SR 519, SEATTLE TERMINAL ELECTRICAL DISTRIBUTION SYSTEM UPGRADE
- CONTRACT 8192 - Executed 9/20/11 SR 519, SEATTLE FERRY TERMINAL - SLIP 2 MECHANICAL & ELECTRICAL REHABILITATION
- CONTRACT 8195 - Executed 9/21/11 NSC - PARKSMITH INTERCHANGE
- CONTRACT 8202 - Executed 9/22/11 PIERCE COUNTY PEO TENANT IMPROVEMENTS
- CONTRACT 8205 - Executed 9/20/11 POINT DEFIANCE AND TAHLEQUAH FERRY TERMINALS TRANSFER SPAN OVERLAYS
- CONTRACT 8189 - Executed 10/13/11 EB NALLEY VALLEY - HOV
- CONTRACT 8177 - Executed 10/5/11 RICE ROAD INTERSECTION - SAFETY IMPROVEMENTS
2010
- CONTRACT 7983 Executed 8/26/10 WSF, PORT TOWNSEND FERRY TERMINAL DOLPHIN PRESERVATION SLIP 1
- CONTRACT 7984 Executed 9/7/10 SR 105, NORRIS SLOUGH CULVERT REPLACEMENT
- CONTRACT 7985 Executed 9/8/10 PCC RAIL, 2010 PCC DRAINAGE REHABILITATION
- CONTRACT 7986 Executed 9/3/10 WSF, SEATTLE FERRY TERMINAL SHEET PILE WALL REPAIR
- CONTRACT 7987 Executed 9/10/10 SR 520, EVERGREEN POINT FLOATING BRIDGE TOLL SIGNING
- CONTRACT 7991 Executed 9/14/10 HYAK PRE-WASH BAY
2009
- CONTRACT 7802 Executed 8/26/09 I-90 & SR 520, LAKE WASHINGTON FLOATING BRIDGES ANCHOR CABLE REPLACEMENT
- CONTRACT 7806 Executed 8/18/09 US195, CHENEY - SPOKANE RD RIGHT TURN LANE
- An American Recovery and Reinvestment Act project
CONTRACT 7796 Executed 8/25/09 I-5 & SR 501, SR 501 RIDGEFIELD INTERCHANGE - CONTRACT 7808 Executed 9/11/09US 101, PURDY CREEK MITIGATION
- CONTRACT 7810 Executed 9/15/09 SR 112, EMERGENCY SLIDE REPAIR 9.4 MILES W OF REYNOLDS RD UNSTABLE SLOPE
- CONTRACT 7812 Executed 9/15/09 SR 520, ADVANCED CONSTRUCTION METHODS AND ENGINEERING FOR PONTOONS
- An American Recovery and Reinvestment Act project
CONTRACT 7805 Executed 9/22/09 US 101 & SR 109, MYRTLE ST TO ENDRESEN AVE & US 101 TO EISENHOWER ST - SIDEWALKS AND ADA RAMPS
2008
- CONTRACT 7596 Executed 8/25/08 SR 261, SMITH HOLLOW ROAD VICINITY STABILIZE SLOPE
- CONTRACT 7589 WSF, PORT TOWSEND FERRY TERMINAL SLIP 1 WINGWALL REPLACEMENT
- CONTRACT 7593 Executed 8/22/08 SR 206, MOUNT SPOKANE STATE PARK VICINITY WASHOUT- REBUILD ROADWAY
- CONTRACT 7591 Executed 9/22/08 I-5, CENTRAL KING TO SOUTH SNOHOMISH BRIDGES-SEISMIC
- CONTRACT 7599 WSF, SEATTLE FERRY TERMINAL TIMBER TRESTLE PRESERVATION
- CONTRACT 7601 Executed 9/2/08 SR 530, SAUK RIVER (SITE #2) STABILIZIE RIVER BANK
- CONTRACT 7600 Executed 9/11/08 SR 26 E. of Vantage Guardrail and Drainage (Small Works Roster Project)
2007
- CONTRACT 7395 EXECUTED 8/17/07 SR 105, JOHNS RIVER BRIDGE PIER REPAIR
- CONTRACT 7397 Executed 8/27/07 I-182, COLUMBIA RIVER BRIDGES JOINT REPAIR
- CONTRACT 7399 Executed 8/28/07 SR 16, CEDAR STREET TO OLYMPIC DRIVE NW-MISCELLANEOUS WORK
- CONTRACT 7398 Executed 9/6/07 SR500, NE 162ND AVE NOISE WALL
- CONTRACT 7387 Executed 9/20/07 US 97, BIGGS RAPIDS BRIDGE 97/1 DECK REPLACEMENT
- CONTRACT 7401 Executed 9/18/07 US 101, VICINITY SUNNYSLOPE ROAD UNSTABLE SLOPE
- CONTRACT 7402 Executed 9/27/07 SR 99, YESLER WAY VICINITY FOUNDATION STABILIZATION
2006
- CONTRACT 7190 Executed 8/16/06--US 12, WHITE PASS VICINITY 2006 ROCKFALL PREVENTION
- CONTRACT 7191 Executed 8/29/06--SR 17, PIONEER WAY TO STRATFORD ROAD
- CONTRACT 7180 Executed 9/5/06--SR 509, VIC MP 22.95 MITIGATION SITE
- CONTRACT 7195 Executed 9/5/06--SR 122, CINEBAR RD. TO JERRELLS RD. GUARDRAIL UPGRADE
- CONTRACT 7185 Executed 9/8/06--SR 18, MAPLE VALLEY TO ISSAQUAH/HOBART RD ROADSIDE RESTORATION
- CONTRACT 7196 Executed 9/8/06--US 101/SR 512, MEDIAN HIGH-TENSION CABLE BARRIER
- CONTRACT 7192 Executed 9/28/06--SR 522, CORRIDOR IMPROVEMENT 153RD SIGNAL & ROADWAY WIDENING
- CONTRACT 7189 WSF, ANACORTES FERRY TERMINAL DOLPHIN REPLACEMENT PHASE II
- CONTRACT 7198 WSF, VASHON FERRY TERMINAL INTERIM TRESTLE PRESERVATION
- CONTRACT 7199 Executed 9/22/06--I-90, KING ST STATION 4TH AVE RETAINING WALL
2005
- CONTRACT 7023 Executed 8/25/05--SR 20, DECEPTION PASS STATE PARK VICINITY UNSTABLE SLOPE
- CONTRACT 7022 Executed 8/25/05--I-90 MEDIAN CROSSOVER PROTECTION
- CONTRACT 7021 Executed 10/10/05--SR 529, SNOHOMISH RIVER BRIDGES 529/10 E & W MOVABLE BRIDGE REPAIR
- CONTRACT 7024 Executed 98/29/05--I-5, PRAIRIE CREEK TO MAYTOWN - MEDIAN BARRIER
- CONTRACT 7018 Executed 9/01/05--SR20, MONKEY HILL RD TO TROXELL RD
- CONTRACT 7025 Executed 10/12/05--I-5, INTERURBAN TRAIL 124TH ST BICYCLE/PEDESTRIAN O'XING
- CONTRACT 7026 Executed 9/16/05--I-5 ET AL, PUGET SOUND VIC. CABLE GUARDRAIL
- CONTRACT 7027 Executed 9/16/05--I-82 & US 12, ALPOWA VICINITY AND COLUMBIA RIVER VARIABLE MESSAGE SIGNS
2004
- CONTRACT 6832 Executed 8/31/04--SR 18, COVINGTON WAY TO MAPLE VALLEY-ROADSIDE RESTORATION
- CONTRACT 6834 Executed 09/13/04--WSF, SYSTEMWIDE FERRY TERMINAL VEHICLE TRANSFER SPAN HYDRAULIC AND CONTROL UPGRADE
- CONTRACT 6835 Executed 9/13/04--I-5 ROANOKE VICINITY NOISE WALL
- CONTRACT 6840 Executed 09/07/04--I-90, GRANT COUNTY LINE TO VICINITY SR 21
- CONTRACT 6837 Executed 9/03/04--I-90, GEIGER RD TO US 2 MEDIAN BARRIER
- CONTRACT 6836 Executed 9/13/2004--SR 290, HELENA ST. LEFT TURN CHANNELIZATION
- CONTRACT 6838 Executed 9/13/04--I-82, PLYMOUTH POE - WIM
- CONTRACT 6843 Executed 9/13/04--UNION GAP WELDING SHOP RENOVATION
- CONTRACT 6845 Executed 9/8/04--I-5, SR 16 TO YAKIMA AVENUE-SB AUXILIARY LANES-PAVING
2003
- CONTRACT 6646 Executed 9/8/03--SR 167, VICINITY BR 167/125E DRAINAGE MODIFICATIONS
- CONTRACT 6645 Executed 9/8/03--CATHLAMET SITE RENOVATIONS
- CONTRACT 6638 Executed 9/10/03--I-5, MURRAY CREEK OUTFALL RETROFIT
- CONTRACT 6652 Executed 9/12/03--I-5, LYNNWOOD 44TH AVE BRIDGE REPAIR
- CONTRACT 6640, Executed 8/29/03--INDIAN JOHN HILL SAFETY REST AREA SANITARY SEWERAGE IMPROVEMENTS
- CONTRACT 6650 I-5 GRAVELLY LAKE TO 49TH ST-FIBER OPTICS
2002
- CONTRACT 6420 Executed 8/27/2002 TUMWATER HQ ELECTRICAL UPGRADE
- Contract 6422 Executed 8/28/2002 WSF, SYSTEMWIDE SECURITY GATES
- Contract 6425 US 101, EVERGREEN PARKWAY VIC. SLIDE REPAIR
- Contract 6423 WSF, BAINBRIDGE FERRY TERMINAL PAVEMENT REPAIR
- Contract 6426 Executed 9/10/2002 I-5, INTERSTATE SIGN SUPPORT STRUCTURES
- CONTRACT 6431 Executed 10/11/2002--RADIO TOWER FOUNDATIONS 2002
- CONTRACT 6415 SR99 TO SR 526 - PHASE 2 AND ITS
- CONTRACT 6428 All Bids Rejected US2 & US 97, CASHMERE VICINITY SIGNAL BEACONS
2001
- Contract 6213 executed 8/17/01- SR 101, LELAND CREEK VIC
- Contract 6217 executed 8/27/01- SR 3, BARNEY WHITE ROAD
- Contract 6180 executed 8/16/01- SR 525, CLINTON FERRY TERMINAL, DOCK EXPANSION PHASE II
- Contract 6202 executed 8/17/01- SR 5 & 543, BORDER XING INFO - PHASE 1
- Contract 6195 executed 8/21/01- SR NSC-HAWTHORNE ROAD TO SR 2 GRADING
- Contract 6199 executed 8/31/01- SR 5, SR 104 TO WB TO NB I-5 ON RAMP
- Contract 6219 executed 9/4/01- SR 2, PINE CANYON SLIDE
- Contract 6214 executed 9/6/01- SR 290 BRIDGE REPLACEMENT 290/4
- CONTRACT 6222 executed 9/27/01- TUMWATER MATERIALS LAB VENTILATION SYSTEM REPAIR
- CONTRACT 6198 executed 9/25/01- SR5, MERCER ST VIC TO 42ND ST ELECTRICAL SYSTEM REBUILD
2000
- CONTRACT 1643 PIER 46 SEATTLE GANGWAY REPLACEMENT
- CONTRACT 5892 SR 525 MUKILTEO FERRY TERMINAL WINGWALL REPLACEMENT PROJECT
- CONTRACT 5923 BAINBRIDGE FERRY TERMINAL DOLPHIN MAINTENANCE PROJECT
- CONTRACT 5936 TIGER RESEEDING
- CONTRACT 5937 EAGLE HARBOR MAINTENANCE FACILITY FLOATING DOLPHIN "18" REPAIR
- CONTRACT 5938 SULTAN-STARTUP ROAD CHANNELIZATION
- CONTRACT 5939 SAMISH RIVER BRIDGE 9/223 SCOUR REPAIR
- CONTRACT 5940 NE 145TH ST (SR523) VIC TO NE 155TH ST PEDESTRIAN ENHANCEMENTS
- CONTRACT 5943 SR 5 NORTHBOUND DOWNTOWN CHANNELIZATION--AVAILABLE SOON
- CONTRACT 5945 SR 105 VIC TO MONTESANO ST.
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.