Studio Display Tilt- and Height-Adjustable Stand

Before You Begin

 Danger

Ensure that the power cord is not plugged into an electrical outlet.

 Caution

Some images show the power cord removed from the display, but during this procedure the power cord should remain connected to the display.

Remove the following part before you begin:

Tools

  • Adjustable torque wrench (2.5–25 Nm)

  • Alignment pins for stand and VESA mount adapter

  • Flathead screwdriver

  • Support wedge for tilt- and height-adjustable stand

  • Torx Plus 20IP 70 mm bit

Removal

Important

Ensure that the support wedge is between the enclosure and the stand to keep the display in place.

  1. Insert the 20IP bit into the 2.5–25 Nm adjustable torque wrench. Remove the two 20IP screws (452-07329) in the order shown. Then install the two alignment pins for stand and VESA mount adapter in the same order.

    • Note: If the alignment pins do not easily fit in, loosen the other three 20IP screws.

  2. Use the adjustable torque wrench and 20IP bit to remove the remaining three 20IP screws in the order shown:

    • (452-07330) (1)

    • (452-07329) (2, 3)

  3. Lift the housing from the stand.

  4. Remove the alignment pins from the stand.

Reassembly

Important

  • If you’re installing a replacement tilt- and height-adjustable stand, use the screws included with the replacement stand.

  • To replace the removed stand with a tilt-adjustable stand, follow the reassembly steps in Tilt-Adjustable Stand.

  • To replace the removed stand with a VESA mount adapter, follow the reassembly steps in VESA Mount Adapter.

  1. Install the two alignment pins for stand and VESA mount adapter into the stand.

  2. Use the alignment pins to position the display onto the stand.

  3. Insert the 20IP bit into the 2.5–25 Nm adjustable torque wrench.

  4. Use the adjustable torque wrench and the 20IP bit to partially reinstall three 20IP screws in the order shown:

    • (452-07329) (1, 2)

    • (452-07330) (3)

  5. Set the torque value to 2.9 Nm. Use the adjustable torque wrench and 20IP bit to partially reinstall the two 20IP screws to 2.9 Nm in the order shown.

  6. Use the adjustable torque wrench and 20IP bit to fully reinstall the right 20IP screw to 2.9 Nm.

  7. Remove the two alignment pins. Use the adjustable torque wrench and 20IP bit to partially reinstall two 20IP screws (452-07329) in place of the alignment pins in the order shown.

    • Note: The alignment pins may get stuck. If they do, use a flathead screwdriver to remove the alignment pins.

  8. Keep the 20IP bit in the 2.5–25 Nm adjustable torque wrench. Ensure that the torque value is still set to 2.9 Nm.

  9. Use the adjustable torque wrench and 20IP bit to partially reinstall the two 20IP screws to 2.9 Nm in the order shown.

  10. Keep the 20IP bit in the 2.5–25 Nm adjustable torque wrench. Set the torque value to 6.4 Nm. Use the adjustable torque wrench and 20IP bit to fully reinstall the four 20IP screws in the order shown.

    •  Caution: Do not tighten the far right screw. It was set to the correct torque in a previous step.

Reinstall the following part to complete reassembly:

Published Date: