Skip to content

Openeuler gitee repos mirror periodic job #1210

Openeuler gitee repos mirror periodic job

Openeuler gitee repos mirror periodic job #1210

Triggered via schedule December 24, 2023 01:56
Status Failure
Total duration 6h 0m 19s
Artifacts

repo-mirror.yml

on: schedule
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
build
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build
The operation was canceled.
build
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 70 MB