Skip to content

[RELEASE] Release 1.6.3 #9433

Closed
Closed
@derekbit

Description

What's the task? Please describe.

Action items for releasing v<1.6.3>

Roles

Describe the sub-tasks.

Pre-Release

The Release Captain needs to finish the following items.

  • Before creating RC1, create a new release branch for the following component repositories, and then create RC1 from the new branch. Leave the master branch for the next feature release development (This task is only needed when doing a feature release such as 1.7.0).
    • longhorn-manager
    • longhorn-ui
    • longhorn-tests
    • longhorn-engine
    • longhorn-instance-manager
    • longhorn-share-manager
    • backing-image-manager
    • longhorn-spdk-engine (needed after GA)
    • cli
  • Trigger the GA release build by longhorn/longhorn Actions

The QA captain needs to coordinate the following items before the GA release.

  • Regression test plan (manual)
  • Run e2e regression for pre-GA milestones (install, upgrade) @yangchiu
  • Run security testing of container images for pre-GA milestones @yangchiu
  • Verify longhorn chart PR to ensure all artifacts are ready for GA (install, upgrade)
  • Run core testing (install, upgrade) for the GA build
    • Upgrade from the previous patch of the same feature release.
    • Upgrade from the last patch of the previous feature release.

Release

The Release Captain needs to finish the following items.

Post-Release

After marking the release as a stable release, Release Captain needs to coordinate the following items

Rancher Charts

The Release Captain needs to coordinate the following items.

cc @longhorn/qa @longhorn/dev

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    • Status

      Closed

    Milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions