Skip to content
Permalink

Comparing changes

Choose two branches to see what’s changed or to start a new pull request. If you need to, you can also or learn more about diff comparisons.

Open a pull request

Create a new pull request by comparing changes across two branches. If you need to, you can also . Learn more about diff comparisons here.
base repository: predictionmachines/InteractiveDataDisplay
Failed to load repositories. Confirm that selected base ref is valid, then try again.
Loading
base: master
Choose a base ref
...
head repository: itislab/InteractiveDataDisplay
Failed to load repositories. Confirm that selected head ref is valid, then try again.
Loading
compare: master
Choose a head ref
Checking mergeability… Don’t worry, you can still create the pull request.
  • 4 commits
  • 4 files changed
  • 2 contributors

Commits on Apr 13, 2016

  1. adding travis configuration

    enabling 'npm test' command (used by travis CI)
    
    adding travis build indicator
    
    Fixing plot tests side effects
    Dmitry A. Grechka authored and dgrechka committed Apr 13, 2016
    Configuration menu
    Copy the full SHA
    b311882 View commit details
    Browse the repository at this point in the history
  2. build indicator url update

    Switching build indicator to show master branch build
    dgrechka committed Apr 13, 2016
    Configuration menu
    Copy the full SHA
    cfa22a3 View commit details
    Browse the repository at this point in the history

Commits on Apr 21, 2016

  1. Merge remote-tracking branch 'origin/master'

    Dmitry A. Grechka committed Apr 21, 2016
    Configuration menu
    Copy the full SHA
    67415cf View commit details
    Browse the repository at this point in the history
  2. Merge branch 'safe_dom_plot_add'

    Dmitry A. Grechka committed Apr 21, 2016
    Configuration menu
    Copy the full SHA
    9b3ed14 View commit details
    Browse the repository at this point in the history
Loading